|
| |||||||||||||||||
17.5m Dome for hire | |||||||||||||||||
Designed and built by The Dome Company with structural analysis by Robert West Consulting. Basis of design drafted by Robert West enclosed.
Construction The frame is of curved laminated beams each of 3 laminates bonded with Resourcinol. The timber are assembled with fabricated steel connectors with galvanised finish. The overslung cover is of acrylic coated polyester (fire certificate). Access Via 5 arched openings each 6.5 metres across the base. These openings can be infilled with removable fabric panels, three of which are z fitted with two laced openings. Imposed loading For lighting, sound and rigging - 65 kilos per frame connector. Anchorage The structure must be anchored except for situations which are, sheltered, short term, attended by a tent crew member and with local authority approval. Anchorage in soft ground is via ten 600mm by 25mm diameter stakes. Anchorage on hard standing via rawlbolts or ballast. Set up time Aproximately 4 hours for four people. Certification Fire
certificate to BS 5438. | |||||||||||||||||
| The Dome Company, Unit 4, Station Yard, Halesworth, Suffolk, IP19 8BZ, UK - T:01986 872175 - M:07966514046 | |||||||||||||||||